Templates that have been modeled and saved in Process Engineer can be imported into DPM for further detailing. The use of templates encourages process plan reuse and reduces time spent in planning. It can also serve as a tool to establish rules and best practices in the planning stage. |
||||||
![]() |
This command is enabled only when a project is open in DPM. | ||||||
|
Inserting a process and/or resource from a template |
||||||
|
|||||||
Instantiate from Template command behaviorWhen selecting only Process(es)Selecting a parent processUpon selecting one or more processes, click Select Parent to select a valid parent process in the DPM PPR tree to insert the process(es) under. If the selected process is valid (in accordance with the plantypeset definition), the process(es) will be inserted under the selected parent. If a parent process is selected that does not have the add child access right and write lock, it cannot be selected as a parent. When selecting only Resource(s)Selecting a parent resourceUpon selecting one or more resources, click Select Parent to select a valid parent process in the DPM PPR tree to insert the resources under. If the selected resource is valid (in accordance with the plantypeset definition), the resource(s) will be inserted under the selected parent. If a parent resource is selected that does not have the add child access right and write lock, it cannot be selected as a parent. Positioning inserted resourcesTo position the inserted resources in the DPM 3D window, either select a location in the 3D space or type an absolute location in the power input box for each resource inserted. Alternatively, all resources can be placed at the origin of the parent by checking the Place at Parent Origin checkbox. If this checkbox is enabled before the resource positioning is initiated, all inserted resources will be placed by default at the origin of the selected parent. However, if the positioning of some resources is performed manually (i.e., the Place at Parent Origin option is disabled), and then the Place at Parent Origin option is enabled, then all remaining resources that have not yet been positioned are automatically positioned at the parent origin. Note that the dialog can be closed only after the inserted resources have been positioned. When selecting both Process(es) and Resource(s)The Copy Related Resources option must be enabled to copy the resources associated to any selected process(es). Selecting a parent process and resourceUpon selecting one or more processes, click Select Parent to select a valid parent process in the DPM PPR tree to insert the process(es) under. If the selected process is valid (in accordance with the plantypeset definition), the process(es) will be inserted under the selected parent. If a parent process is selected that does not have the add child access right and write lock, it cannot be selected as a parent. After selecting a parent process, the user is prompted to select a valid parent resource in the DPM PPR tree to insert the resource(s) under. If the selected resource is valid (in accordance with the plantypeset definition), the resource(s) will be inserted under the selected parent. If a parent resource is selected that does not have the add child access right and write lock, it cannot be selected as a parent. Positioning inserted resourcesTo position the inserted resources in the DPM 3D window, either select a location in the 3D space or type an absolute location in the power input box for each resource inserted. Alternatively, all resources can be placed at the origin of the parent by checking the Place at Parent Origin checkbox. In this case, the relations between the process(es) and the resource(s) are also copied and loaded in DPM. Note that the dialog can be closed only after the inserted resources have been positioned. When selecting one or more Manufacturing AssembliesWhen the Manufacturing Assembly root node is expanded in the template browser and an AST Manufacturing Assembly node is selected, the Apply button becomes activated. A parent node can be selected in the DPM Spec Tree. When the Apply button is clicked, the selected Manufacturing Assembly node is copied under the selected parent. If a parent is not selected before Apply is clicked, the selected Manufacturing Assembly is copied directly under the Applications > Manufacturing Products node of the PPR tree in the current DPM session. When selecting multiple manufacturing assemblies to insert, any duplicate selections (e.g., assemblies that are already children of one or more other selected assemblies) are automatically resolved, and only one instance of the selected object is inserted in the current DPM session. |