In addition to the Lock Management system described in the previous section, a user's ability to load, edit and save objects opened via the Manufacturing Hub is also determined by the user's rights as they are defined in Process Engineer. The sections which follow describe how the user rights defined in Process Engineer affect common tasks in DPM. |
||||||||||||||||
|
When loading a process from the Manufacturing Hub |
||||||||||||||||
Objects that a user cannot read (due to not having read access rights) will not be
loaded in V5, nor will they be visible when the Manufacturing Hub commands such as Insert Product, Search, or Insert Process
are used.
After a process has been opened via the "Open Manufacturing Hub project" command, the Load Status dialog will display list of PPR objects that were not locked because the objects did not have "Change" rights: Viewing the current editing statusAfter a Manufacturing Hub process has been loaded, the editing status of the loaded PPR objects can be viewed via the Get
edit information
A user's ability to modify a process document by manipulating PPR objects is
determined by both the state shown in the Object Status and User Rights columns, as shown in the above dialog.
Note that to be able to save a product or resource assignment to a process, the user must have "Add Child" rights for both of the objects. |
|||||||||||||||||
Notes |
|||||||||||||||||
When creating a resource |
|||||||||||||||||
When the Create Resource command
![]() ![]() After a valid parent and Plan Type have been selected, the new resource will be created. If the user does not have "Create" rights for the resource type selected in the Add Resource drop-down combo box, a message is displayed to inform the user that he/she does not have "Create" rights for the type: |
|||||||||||||||||
When inserting a Work System Component |
|||||||||||||||||
The Insert Work System Component command works much like the Create Resource command, wherein the Work System Component must be inserted under a resource that has the "Add Child" right assigned. |
|||||||||||||||||
When inserting an activity |
|||||||||||||||||
Due to the nature of the Insert Activity command (i.e., it is not a command that is specific to Manufacturing Hub), if a user does not have the necessary rights to insert an activity, presently the selected activity will be inserted in the current V5 session but not saved in the Manufacturing Hub. |
|||||||||||||||||
When assigning (and unassigning) products and resources to a process |
|||||||||||||||||
A product or resource may be assigned to a process only if the process and product (or
resource) have "Add child" rights for the current user. In the same manner, both objects require the "Remove child"
rights for the user to be unassigned. If these rights are not present, the operation accomplished in DPM will not
be saved back into the Manufacturing Hub.
|