When a project is created, it may define multiple product and resource structures.
Different product structures can correspond to EBOMs (Engineering Bill of Materials) and MBOMs (Manufacturing Bill
of Materials). Similarly, multiple resource structures can be created to represent the different sets of resources
that a site may have.
After the process and level of detailing have been selected, the user is prompted to select the BOM from which
the products and resources will be loaded. A dialog is presented which lists all product and resource structures
under the selected process which have been defined as BOMs in Process Engineer:
|